Genuine project gallery
Current Pressure Cleaning Work
Genuine job photographs: patio, wall capping and side path cleaning from 19 October 2026, sandstone patio and pathway cleaning from 12 October 2026, plus our existing verandah, brick exterior and side-path work in progress.
Patio, wall capping and side path
Before and after-cleaning photographs of a patio, wall capping and a long side path. The pairs show the same areas from different camera positions; original timestamps and natural colours are retained.
Before
After
Before
After
Before
AfterSandstone patio, verandah and pathways
Before, during and after-cleaning photographs show the paving around a patio, a sandstone verandah and two garden paths. The pairs show the same areas from different camera positions; original timestamps and natural colours are retained.
Before
After
Before
After
Before
After
Before
AfterMore from this collection
Work in progress
Verandah and exterior pressure cleaning
These photos and clips show active pressure cleaning around the verandah, brick exterior and concrete paths of a single-storey red-brick home during the current restoration work. They document the cleaning stage only; the job is not presented as finished or as a before-and-after result.
Watch the cleaning in action
Short clips taken on site while the pressure cleaning was underway.
Current status: cleaning in progress
Final-result photos are pending completion of the wider exterior and brick restoration work.
Looking for the same work at your place? See our house washing and pathway cleaning services.






